Laserfiche WebLink
VECTOR <br />ENGIIVEERINC� INC. <br />0 DAILY CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />46 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />July 18, 2006 <br />Tuesday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />Native soils <br />Clear, It. breeze (NW), mid 70's to mid 100's <br />Mike Strobel <br />Equipment on site: <br />4x637 scrapers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe, forklift <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. Continued finish grading of the floor subgrade in FU -06; paddle wheel scraper and blade using GPS, <br />followed by moisture conditioning and the smooth drum roller. <br />2. Continued excavation of the lateral drainages to the sump in the lower floor area subgrade of FU -06; <br />cut trench for LCRS riser pipes. <br />3. GSE representative Ruben Altamirano on site: off -loads 2 deliveries, 30 rolls total, of textured 60 -mil <br />HDPE. <br />II. Testing <br />1. Performed 8 FDT's in compacted Subgrade in the west floor area, tests SG -77 through SG -83; all tests <br />passed. <br />III. Conversations <br />• None listed. <br />Prepared By: <br />Reviewed By: <br />1 of 1 4/23/03, Rev. 0 <br />