My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:25 PM
Creation date
7/3/2020 10:52:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
two. U4.ZUUD 14 Da #13lu F.UU4 <br />Mir <br />ENGINEERNG, INC. <br />DAILY CONSTRUCTION FIELD REPORT <br />NUM., <br />NO. <br />50;0117 <br />TQ'rW_4Td-WMlJ FIJ-06 <br />02.1-605-07 <br />50 <br />Lowil"on or Worl., <br />Clicht Or Manuger <br />nay nrilic Wcck. <br />S lock ton <br />Allied Waste <br />July 22, 2006 <br />Sa-ftirday <br />General Contrwhir <br />Unar Contmetor. <br />pfoject Enginecr: <br />Keviewed By. <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />I,mer . N . uiiennttnaew: <br />Othcr: <br />Larry Simms <br />n/a <br />Source and Dese6plion or Fill maieiiai: <br />Weathel.CQA <br />Tochnician: <br />Native soils <br />Clear It. breeze (NW),,Wg4 79's to highl 00's <br />Mikc Strobel <br />4Xscrapers, 1)0 i4o�� . rnpactor, water truck, excavator, rock, truck, loader, backhoe, tbrklift <br />!a_Al co <br />NOTES (Describe work completed during Oft qNy, any problems Nod their solution.% - <br />I. Construction <br />1. GSE starts deployment of 6D -mil single -sided textured T MPF on the cast berm, upper area ofF1 J-06. <br />11. Testing <br />1. Monitored activities by QSE: observed trial weld, deployment, plwel searning and air pressure testing. <br />Pancls 1, 2 and 3 deployed this morning, covering 14,562 ft2 of surface area. <br />I. Convcrsations <br />o - Nonc listed. <br />�Pllrcd Ry�✓Reviewed 13y: <br />1 ori 4/23/03, Rev. 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.