Laserfiche WebLink
two. U4.ZUUD 14 Da #13lu F.UU4 <br />Mir <br />ENGINEERNG, INC. <br />DAILY CONSTRUCTION FIELD REPORT <br />NUM., <br />NO. <br />50;0117 <br />TQ'rW_4Td-WMlJ FIJ-06 <br />02.1-605-07 <br />50 <br />Lowil"on or Worl., <br />Clicht Or Manuger <br />nay nrilic Wcck. <br />S lock ton <br />Allied Waste <br />July 22, 2006 <br />Sa-ftirday <br />General Contrwhir <br />Unar Contmetor. <br />pfoject Enginecr: <br />Keviewed By. <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />I,mer . N . uiiennttnaew: <br />Othcr: <br />Larry Simms <br />n/a <br />Source and Dese6plion or Fill maieiiai: <br />Weathel.CQA <br />Tochnician: <br />Native soils <br />Clear It. breeze (NW),,Wg4 79's to highl 00's <br />Mikc Strobel <br />4Xscrapers, 1)0 i4o�� . rnpactor, water truck, excavator, rock, truck, loader, backhoe, tbrklift <br />!a_Al co ­ <br />NOTES (Describe work completed during Oft qNy, any problems Nod their solution.% - <br />I. Construction <br />1. GSE starts deployment of 6D -mil single -sided textured T MPF on the cast berm, upper area ofF1 J-06. <br />11. Testing <br />1. Monitored activities by QSE: observed trial weld, deployment, plwel searning and air pressure testing. <br />Pancls 1, 2 and 3 deployed this morning, covering 14,562 ft2 of surface area. <br />I. Convcrsations <br />o - Nonc listed. <br />�Pllrcd Ry�✓Reviewed 13y: <br />1 ori 4/23/03, Rev. 0 <br />