Laserfiche WebLink
Hul4,u4.4uun 14:-')ts <br />#1310 P.U43 <br />CTOR <br />IXT NEIRINGr, INC. <br />Project Namc. _ <br />Project No. <br />itu}x►n .5nyueiiaa <br />Forward WMIJ FTI -06 <br />02.1605.07 <br />49 <br />i mcaiiuo or Work: <br />Client Or Manager <br />Datc: <br />Day ril'Thc week: <br />Stockton <br />Allied Waste <br />Jul 21, 2006 <br />Nricla <br />General Contractor: <br />[Ac"T Contrsctnr: <br />Prajcct Engmwr <br />Reviewed HY <br />Gw nn Construction <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />nUui. <br />Larry Simms <br />n/a <br />Source and Description of Fit] Material: <br />Weather: <br />c't1A'I'echmFuui. <br />Native sails <br />Clefar, lt, hrceze (NM, low 70's to mid100's <br />Mike Strobel <br />ryu'Pn'cna ')]1-%110- <br />nsue. <br />4x637 scpipers, ll6 dozer, 815 compactor, water tnick, excavatnr, rack truck, loader, backhoe, rorkl ft <br />NOTES (Describe work enmpIrtod during tiro day, any prtibleins and their aoludons): <br />1. C..'onstmetion. <br />1. Continued work on the +outh-side roadway. <br />2. GSU continued filling sand bugs and off-loading, deliveries of geosynthetics. <br />Today's deliveries: Truck load #7, 7/21/06 w/11 rolls DST 60 -mil. <br />Truck load 48, 7/21/06 w/10 rolls Bentofix and 20 bags of bentonite, <br />Tnlck load #9, 7/21/06 w/10 rolls Bentofix and 20 bags of bentonite. <br />11.Testing <br />1. Collected 2 samples ol' C•.'lay Liner sails Fi-om the east -side stockpile, samples CLP -land C LP -2, for <br />laboratory tests. <br />TiT. Conversations <br />• With Air from (ISL', re: GSE will be on site tomorrow to start deployment oil the beans in the <br />upper area. of FU -06. A Vector Engineering, Inc. technician will he on site for clucunientat•ion. <br />_ <br />Reviewed By , <br />i of 1 4/23/03, Rev. 0 <br />