Laserfiche WebLink
HUCi.u4.LUu0 14:ay <br />® DAILY CONSTRUCTION FIELD REPORT <br />#13au e.uun <br />T 7F TOR <br />ENGINEERING, INC. <br />Frojecl Name: <br />Pn;ieict No. <br />ltcpoit Sequence <br />Forwarrd WMU FU -06 _ _ <br />02,1605.01 <br />52 <br />location of Work. <br />Client Or Mahkw <br />brae: <br />Day of Y'he WMk: <br />Stockton <br />Allied Waste <br />July 25, 2006 <br />Tuesday <br />General Contractor: <br />Liner Contractor:. <br />Wnrject Gnµineer: <br />Reviewed Kyi <br />Gwinn Construction <br />n/n. <br />Monte Christie <br />General Poeonlart. <br />Liner Superintendent. <br />Other: <br />Larry Simms <br />n/a <br />Sauces end Description of Fill Material: <br />Weather: <br />CCA Tcchnicinn: <br />Native soils <br />Clear, It. br6eze (NW), hi ri 70's to anid100's' <br />Mike Strobel <br />Gtluipnleul oil site: <br />4x627 scrapers, ND6,dozers, 815 compactor, 2 water trucks, excavator, rock truck, loader, backboo, lvrklift <br />work completed duringthe day, any problems and <br />1. C:oxistruction <br />1. GSE completes mitis. repairs to liner installed on the berms in the upper arca of WM.Lf Fl.t-06- GSE <br />also continued off-loading deliveries of geosynthetics. <br />Today's deliveries: Truck load # 13, w/10 rolls Bentofix. <br />Truck load # 14, w/10 rolls l}entofx. <br />Truck lead # 15, w/10 rolls DST 60 -mil and'I rubsheet. <br />Truck load # 16, w/l0 rolls Bentofix and 25 bags of bentonite. <br />Truck load # 17, w/11 rolls of Bentofix. <br />2. (3wilni Construction continued placement of the Clay Liner in the lower licca of WMU VU -06. Pre <br />conditioned material is, collected fi•om the east area stockpile by scrapers, spread in "thin" V-6" loose <br />lifts, followed by additional moisture cotlditioning atxd compaction equipment. <br />il. Testing <br />1. Monitored activities by GSE: complete all paperwork for liner installation, <br />111. Ccmversations <br />® None listed. <br />repured By Reviewed 13y. <br />I of 1 4/23/63, Rev. 0 <br />