Laserfiche WebLink
AUQ7:'U4.GUUV 14C:)"J $131U Y.UU/ <br />VCTOR <br />NGINKhRNG, INC. <br />DAILY CONSTRUCTION FIELD REPORT <br />Pnijl:" NUMC; <br />ProJcct No, <br />Ronnrl Segumice <br />Forward WMU 1'U-06 <br />(12,1605.07 <br />53 <br />i.newon or Work: <br />Client Of Mailugor <br />Dam. <br />Day of The Wcck: <br />Stockton <br />Allied Waste <br />July 26, 2006 <br />Wednesday <br />General conu=Lor. <br />t.incrContractor: <br />Project Unginecr: <br />Reviewed Rv; <br />Gwinn Construction <br />,n/a <br />Monte Cluistie <br />t encral Forcman. <br />I.Iner tiuperintcndcnt: Othcr: <br />Larry Sininls <br />n/a <br />Wwuhor: <'.(}A Technician: <br />Sokinx and DeSc6ptiun of Dill Mutgriai: <br />lVflllvC Sa)ll5(:Iear, <br />It. breeze' NW), luw 70's to 1uw100's Mike Strobel <br />1'•quipmr.tit vii SILO; <br />4x627 scraper;,, 2xT)6 dozers, 815 coniaactor. 2 water trucks. vxcavatur. rock truck. loader. backhoe. forklift <br />S (Describe work completed during, the day, any problems and their <br />1. Constrtx doll <br />1. Uwitni< Construction continued placement ol'the. Clay Liner in the lower area al- WM[J F(J-06; have the <br />first lift across the entire area and about half --way with the second lift. Starting the third lift along the <br />west side. <br />2_ C11,81; CotitinUed off-loading deliveries of gcosynthetics. <br />Today's deliveries; Thick load 4 18, w/11 rolls Bentofix. <br />Testing <br />1. Pe;rlormed 5 VDT's in conipacted Clay Liner; tests CIA through (AA. Preliminaq information <br />indicates passing results. <br />2. Performed Sand Cunt test in compacted Clay Liner, test SCOL -5. <br />3. Collected Shelby TUbcs in compacted Clay Liner, test samples STC.T.-5A and 5131 <br />Ill. Conversations <br />® None listed. <br />...re 9srLd �FC • .. ....._._ <br />t / Reviewed By:, <br />is <br />of 1 4/23/03, Rev. 0 <br />