Laserfiche WebLink
AUG 04.2006 14:59 #1310 P.010 <br />E V i u.R <br />ENGINE RINC7, INC, <br />DAILY CONSTRUCTION FIELD REPORT <br />i'mjbu Numc Fr,11W No. Report Sequence <br />T orward .WMLJ FLJ*06 02.1605.07 __ :56 <br />Loculiun ur Work: Callen 6 Msuiager llflte. Day of The Weak: <br />Stockton Allicd Waste July 31, 20()6 Monday <br />Ciencrul Contruc:iur:. Lme i Contruchsc Project F;ngirh¢wr: Kuyiewed By.: <br />Crwinn Construction n/a Monte Christie <br />601lend F'urroman; Liner Superintandent: Alper: <br />Larry Simlms t)/a <br />Source and Dcscriptinn of Fill Material: Wwathcr: CQA Technician: <br />Native soils Calcar, lt. brcczc (NW), hil;h 50's to hi h 90's =MikeStrobel <br />Equipment on site: <br />4x627 ser4e'prs, 2xD6 do;eers, 815 cratnpactor, 2 water trucks, cxc4.vator, rack truck, loarl!.r, backlxoe, forklill <br />NOTES (Describe Work completed during the day, any problems And their solutions): <br />1. 'otistruction <br />1. Gwinn Constl uction continucd placement of the Clay Litter in the lower area of WMU F 11-06. <br />2. Continued deployment filter Sec>textile and placement til' the Granular Drainage materials along the <br />inside of the bbrâ–ºns in the northem portion of FU -06. <br />1. '1'cstirl <br />1. Pcrfomicd 11 FDT's in compacted Clay Liner, tests M-43 through C'L-53; all passed. <br />2. Pcrformed sand cone test SCOL -44. <br />3. Collected Shelby 'Dube permeability samples; tests SC'CT-43A and STCL-4313. <br />111. Coll Versati oils <br />Nano listed. <br />Of t <br />;y: <br />4/23/03, Rev. 0 <br />