Laserfiche WebLink
AUG.04.2006 15;00 <br />DAILY CONSTRUCTION FIELD REPORT <br />#1310 P.011 <br />/ENGINEERING, INC. <br />P7,7 ZZ <br />No. <br />Report841-cncc <br />T'orwimi -WM-U %C.i-UG <br />02.100.07 _ __ <br />57 <br />Location of Work: <br />cl ctlt or Mettagce <br />Date: <br />Day erTh® Week: <br />stockton <br />Allied Waste <br />August 1, 2006 <br />Tuesday <br />(•IcncrAi Cobtractor' <br />Liner Contmotor <br />Pcojecl Engineer: .,,. <br />Reviewed Dy. <br />CSwinn Construction <br />n/a <br />Monte Christic <br />CiCneral orwnwi: <br />l <br />Liner 5uliarintende ni: <br />Other: <br />Larry Simms; <br />n/a <br />tiuurcc emel i ksenptionof Fill Material: <br />Weather <br />CQA •I'uchniciaw <br />•Native Sails_ <br />Clear It, kiree�e(NW) high 5t?'s to mid 9U's <br />Mike Strc>!bel <br />>:qui'ymrnt oil $id. <br />4x(:23.,sctapers, 2xD6 dozers, 81S compactor, 2 water trucks, excavator, rack track, loader, backhoe, forklift <br />NOTES (Describe ewark eompleted dtering the day, uny probleuex anti their enlutions)s <br />1. Co'n'struction1. Gwinn Construction continued placement of the Clay Liner in the lower area o1' WMIJ F IJ -06, <br />2. C ontinued depll ytneot filter geotcxtile send placement of the Granular Drainage materials along the <br />inside of'thc berms in the northern }portion, o�l'FiJ-06. <br />11. 'Testing <br />1. Performed 42 FDT's in compacted Clay Lhwi-; tests CL -54 through CL -85 all passed. <br />2. Performed sand cone tests SCC1.-60 and SC,CL-84. <br />3. Collected Shelby'l'ubc permeability samples; tests STCL-49A & B. STC:L-54.A & R, STCL-64A & 13, <br />STCL-85A & 13 and STCL- 86A & B. <br />111. Conversations <br />• Nome listed. <br />reparcd F , tteviewed Ry: <br />1 or 1 4/23/03, Rev. ,n <br />