Laserfiche WebLink
1. The pH, conductivity, and nubidlity inetess will be calibrated at aini <br /> tzm at the <br /> begin=* g of p ' day ' g ercially obta hed.scan "bration Will <br /> be checked two to three times during the day toevaluale the potential that the calibration <br /> is driffing throughout the day. ant drift is detected in the field, the <br /> measurements taken during purging and sampling will be adjusted accordhigly. Example <br /> calibration logs are included purging and sampling of the wells <br /> the i ants ` be in the a '®n- <br /> 2. Depth to water will be measured again, prior to sampiing. an each well as described in <br /> Section 4.4.1 and recorded on the Purge Cliaracttrization,and Sample Log. The velums <br /> of groundwater in the well casing will be calculated using the following equation(s): <br /> 4-inch well: (Total Well .Depth from the madc on the well casing (ft) - Ll?VI (fr)} x <br /> 0.653 gal/fL <br /> Prior to ptrrgzng, the-water -be-. Eby-using-a_disposable-bailer that is clear- <br /> enough to .sec through. Features such as immisciffile layers will be noted and-m <br /> If'hnmiscieasured- <br /> ble layers-are o ed the well " not be purged prior to sampling_ <br /> 4-. The well will then be purged using the-purge s_.:_Dere to the-fact that the pumps must { <br /> purge water from depths as great as-70 to 80 feat below ground surface-, e rates e <br /> PSS r <br /> from 114 to I gallon per minute_ This-purge rate sloes not appear to exceed the recharge <br /> rates. of the wells. Purge vrater will be discharged to-the ground (sec Section 4.4.6)_ <br /> Depth to water measurements will be taken periodically during p The purpose of <br /> these measmmments 2s to monitor-dramdown. If a in groundwatcrcdcvation is <br /> the purge rate will be decreased un (purge rate equals recharge rate) = <br /> is achieved.. The Lvquency of measurement will be-once every five minutes initia.Uy <br /> decreasing to once every onc—halfhour once equihibrium has been reached. <br /> If equilibrium cannot be reached,it will be necessmy to purge the well to ass_ c. <br /> until less than 1 Mo of the original volume of water remains in the well, Hand bailing <br /> May bo rcquired to mczt thiss objective- Monitor the DTW every 15 minutes to evaluate <br /> e. Start sample collection-vfien citlier two fed of water has filled the well or 1.75 <br /> hours has elapsed since the end of purging. Collect vv c organics no later than two <br /> hours after purging. rd all actions andan associated with purging a well <br /> dry on the Purge Charactmization and Sample <br /> 34 11231 OR323 A•7 }u}y l 4,2400 <br /> da"Ux- <br />