Laserfiche WebLink
Sampling Arid <br /> Yde,-d.Protocol <br /> The following protocols have been developed to incr=,. the accuse j <br /> groundwater monitoring data. The p ofestablishing Y and comparabili(y of the <br /> (I) to reduce sources of error t be in and followutg.thc Feld protocols are <br /> during g Pig and, ) to collect <br /> in a consistent manner so t to sets Samples <br /> comp _ ill . mp . le. Therefore, project goals for <br /> ty .and ace " include folio i the procedures described isr <br /> ent.possible, When field conditions necessitate a change this Section to the <br /> nee char from the fished protocols, the <br /> 8 be implemented with ` t c,e of Sampling.accuracy and <br /> data <br /> corn bility as priorities. Argy m `on to c set <br /> protacal necessitated by field conditions and c r ' be procedures delineated-in - <br /> noted on the Technicians Daily <br /> Report(See Section 2.7).. - <br /> Depth To Water Measurements <br /> to water mea surements will be made in a yells at the site prior to initiatin <br /> and sampling, including.w arc not to pled. The measurements g p ° g <br /> mentis be a fou• <br /> _ times a Yom'poor to initiating . <br /> ling round, ere arc no px etcrs-at the site-. She -- <br /> depth to water to encs vO be made <br /> consecutively,inns short a time as <br /> potential errors due to daily variations is the w=er table- possible, to reduce.: <br /> Dtpth4o--water CU will be m .in the well to within 11100 of afoot a <br /> side of the top of <br /> r�nductiVity-basscd water level indi r. c exits <br /> will be taken ru the north or. ed <br /> ca-ling of on the <br /> casingshave bcx= surveyed by a - <br /> survey re ® 'c to mean sea I L). <br /> ' d ips, <br /> Probe is ° d into the well ugh a + l�' the c r Icrcf <br /> . <br /> The conductivity be and <br /> cable be in dei <br />