closure improvements constructed (e.g., final cover, permanent drainage, landfill <br /> gas system modification, etc.). <br /> 1.3 Maximum Extent of Landfill That Will Ever Require Closure <br /> The maximum extent of the landfill that will ever require closure during the life of the <br /> landfill is 187.6 acres since Stage IA partial final closure construction was completed <br /> in 2006. Table 1 presents the anticipated staged closure acreages versus the liner <br /> development phases to show the maximum extent that would ever require closure. As <br /> shown, liner development Phases 1, 2, 3 and 4 would be completed before the Stage I <br /> closure is implemented creating the basis for maximum extent. <br /> The site's closure staging was developed so as to not interfere with active disposal <br /> operations. <br /> 1.4 Closure Implementation <br /> A closure implementation schedule for the FL will be presented in each Partial Final <br /> Closure as phased closure is implemented. Closure construction will begin with <br /> mobilization of equipment and materials. The type of equipment and required <br /> personnel expected to be utilized during closure construction includes, but is not <br /> limited to, the following: <br /> Equipment <br /> — Scrapers <br /> — Dozers <br /> — Loaders <br /> — Compactors <br /> — Trucks <br /> — Soil Processing Equipment <br /> — Motor Grader <br /> — Water Truck <br /> • Personnel <br /> — Construction Manager <br /> — Field Inspector(s) <br /> — Site Engineer(s) <br /> — Geotechnical Technician(s) <br /> — Labor Crews <br /> — Equipment Operators <br /> — Surveyors <br /> — Mechanics <br /> 5 <br /> Forward Landfill-PCPCMP Amendment <br /> (Z:\PROJ ECTS\Al lied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\Clos Amend 3 Final.doc; <br /> Amendment No.3:7/1/2008) <br />