My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_24
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:28 PM
Creation date
7/3/2020 10:53:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_24
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_24.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
closure improvements constructed (e.g., final cover, permanent drainage, landfill <br /> gas system modification, etc.). <br /> 1.3 Maximum Extent of Landfill That Will Ever Require Closure <br /> The maximum extent of the landfill that will ever require closure during the life of the <br /> landfill is 187.6 acres since Stage IA partial final closure construction was completed <br /> in 2006. Table 1 presents the anticipated staged closure acreages versus the liner <br /> development phases to show the maximum extent that would ever require closure. As <br /> shown, liner development Phases 1, 2, 3 and 4 would be completed before the Stage I <br /> closure is implemented creating the basis for maximum extent. <br /> The site's closure staging was developed so as to not interfere with active disposal <br /> operations. <br /> 1.4 Closure Implementation <br /> A closure implementation schedule for the FL will be presented in each Partial Final <br /> Closure as phased closure is implemented. Closure construction will begin with <br /> mobilization of equipment and materials. The type of equipment and required <br /> personnel expected to be utilized during closure construction includes, but is not <br /> limited to, the following: <br /> Equipment <br /> — Scrapers <br /> — Dozers <br /> — Loaders <br /> — Compactors <br /> — Trucks <br /> — Soil Processing Equipment <br /> — Motor Grader <br /> — Water Truck <br /> • Personnel <br /> — Construction Manager <br /> — Field Inspector(s) <br /> — Site Engineer(s) <br /> — Geotechnical Technician(s) <br /> — Labor Crews <br /> — Equipment Operators <br /> — Surveyors <br /> — Mechanics <br /> 5 <br /> Forward Landfill-PCPCMP Amendment <br /> (Z:\PROJ ECTS\Al lied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\Clos Amend 3 Final.doc; <br /> Amendment No.3:7/1/2008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.