Attachment 1
<br /> Final Closure Construction Cost Estimate for the Jamestown Landfill -2008
<br /> Boston Pacific, Inc.
<br /> Item
<br /> No. Item Unit Est.Qty Unit Price Total
<br /> Construct Geocomposite Tie-In to
<br /> 28 LF 1,600 $48.30 $77,280.00
<br /> Drainage System(6-inch)
<br /> Construct Geocomposite Tie-In to
<br /> 29 LF 6,800 $33.70 $229,160.00
<br /> Drainage System 4-inch)
<br /> 30 Prepare,Place and Compact CY 58,864 $12.80 $753,459.20
<br /> Vegetative Soil Layer
<br /> 31 Construct Access Roads LF 3,400 $8.30 $28,220.00
<br /> 32 Hydroseed and Permanent Erosion ACRE 18 $4,630.00 $83,340.00
<br /> Control
<br /> 33 Install Survey Monuments EA 4 $1,520.00 $6,080.00
<br /> 34 (Construct
<br /> onstruct V-Ditch Type 1(Concrete) LF 3,400 $26.30 $89,420.00
<br /> 35 onV-Ditch Type 2(Concrete) LF 1,700 $38.50 $65,450.00
<br /> 36 struct V-Ditch Type 3(Riprap) LF 2,000 $17.40 $34,800.00
<br /> 37 Drainage Inlets for Storm Drains 2,3, EA 3 $2,000.00 $6,000.00
<br /> 5 --
<br /> 38 Drainage Inlets for Storm Drains 1,4, EA 4 $1,840.00 $7,360.00
<br /> 6,7 --
<br /> 39 Drainage Inlets for Storm Drains 8,9 EA 2 $1,990.00 $3,980.00
<br /> Construct Western Outlet Structure
<br /> 40 LS 1 $6,200.00 $6,200.00
<br /> and Apron
<br /> 41 Construct SE Basin Inlet and Riprap LS 1 $4,540.00 $4,540.00
<br /> A ron
<br /> 42 Construct SE Basin Outlet Structure LS 1 $5,100.00 $5,100.00
<br /> and Riprap Apron
<br /> 43 Construct Upper Northern Outlet and LS 1 $1,370.00 $1,370.00
<br /> Riprap Apron
<br /> 444 Construct Lower Northern Outlet and LS 1 $1,370.00 $1,370.00
<br /> Riprap Apron
<br /> „Drainage Pipe, 24-inch HDPE LF 70 $46.10 $3,227.00
<br /> 46 Drainage Pipe, 18-inch HDPE LF 430 $33.90 $14,577.00
<br /> 47 Drainage Pipe, 12-inch HDPE LF 480 $23.00 $11,040.00
<br /> TOTAL A $4,749,827.71
<br /> Highlighted items unit prices were utilized for the Forward Landfill Closure Cost Estimate Table 3 of PCPCMP
<br /> Amendment No.3. Information obtained from Sukut Construction,one of the bidders on this Public Works
<br /> project. This information was submitted in the form of a construction bid estimate to remediate and close the
<br /> Jamestown Landfill,Tuolumne County.
<br /> I', Z:\PROJECTS\Allied Waste\1N81013 5 yr Review Plan\PCPCMP Amend 3 July 08\13oston Pacific
<br />
|