Laserfiche WebLink
Guinn Construction Bid Sheet <br /> Supplement <br /> Worksheet Conversion from Sq Ft to CY <br /> • Item No.6 from Guinn Construction bid sheet dated 5/19/08 for FU-08 calculation for conversion to cubic yard <br /> cost <br /> (326,300 x 2=652,600 c ft/27=24,170 c y <br /> 163,150/24,170=$6.75) <br />