Laserfiche WebLink
TABLE 4 <br /> FORWARD LANDFILL <br /> ANNUAL POST-CLOSURE MAINTENANCE AND MONITORING <br /> ® COST ESTIMATE SUMMARY <br /> Item Unit Price Total <br /> No. Description Quantity ($) ($) <br /> 5 STORMWATER MONITORING (5) <br /> System Monitoring <br /> Labor 8 hrs 45.21 perthr $362 <br /> Equipment 1 LS 400 $400 <br /> Materials/Laboratory 1 LS 2,250 $2,250 <br /> Management 2 hrs 125per/hr $250 <br /> Analysis 4 hrs 100per/hr $400 <br /> Reporting 1 LS 2,500 $2,500 <br /> Subtotal $6,162 <br /> 6 FINAL COVER SYSTEM 6 <br /> System Maintenance/Repair <br /> Inspection 8 hrs 45.21per/hr $362 <br /> Labor 40 hrs 45.21per/hr $1,808 <br /> E ui ment 1 LS 15,400 $15,400 <br /> Materials 1 LS 27,500 $27,500 <br /> Subtotal $45,070 <br /> 7 LANDFILL SETTLEMENT MONITORING AND MONUMENT MAINTENANCE <br /> Inspection/Maintenance <br /> Labor 16 hrs 45.21per/hr $723 <br /> Materials $900 to replace every 3 ears - 300 LS $300 <br /> Aerial Survey Once every 5 ears ($14,000/5yrs) - 2,800 LS $2,800 <br /> Settlement Report <br /> Engineer 8 hrs 1 100 per/hr $800 <br /> Subtotal $4,623 <br /> 8 VEGETATIVE COVER INSPECTION 7 <br /> Vegetation <br /> Ins ection 16 hrs 45 er/hr $723 <br /> H roseed/Soil Amendments 1 acres 4,680 ac $4,680 <br /> Rodent Control 32 hrs 45.21per/hr $1,447 <br /> Weed/Dust and Fire Control 64 hrs 45.21per/hr $2,893 <br /> Subtotal $9,744 <br /> 9 ACCESS ROAD MAINTENANCE 8 <br /> Road Maintenance/Repair <br /> Inspection 8 hrs 45.21per/hr $362 <br /> Labor 16 hrs 45.21per/hr $723 <br /> Equipment 1 LS 3,060 $3,060 <br /> Materials 1 LS 7,000 $7,000 <br /> Subtotal $11,145 <br /> 10 DRAINAGE CONTROL SYSTEM 9 <br /> System Maintenance/Repair <br /> Inspection 32 hrs 45.21per/hr $1,447 <br /> Labor 64 hrs 45.21per/hr $2,893 <br /> Equipment 1 LS 0 $0 <br /> Materials 1 LS 10,765 $10,765 <br /> Subtotal $15,105 <br /> Z:\PROJECTSWIIied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\Table 4 Post Clos:7/10/2008 Page 2 of 3 <br />