Laserfiche WebLink
TABLE 4 <br /> FORWARD LANDFILL <br /> ANNUAL POST-CLOSURE MAINTENANCE AND MONITORING <br /> COST ESTIMATE SUMMARY <br /> Item Description Quantity Unit Price Total <br /> 11 SITE SECURITY 10 <br /> System Maintenance/Repair <br /> Inspection 20 hrs 45.21per/hr $904 <br /> Labor 20 hrs 45.21per/hr $904 <br /> Equipment 1 LS 0 $0 <br /> Materials 1 LS 2,500 $1,000 <br /> Subtotal $2,808 <br /> TOTAL ANNUAL POST-CLOSURE MAINTENANCE AND MONITORING COSTS $424,678 <br /> TOTAL 30-YEAR POST-CLOSURE MAINTENANCE AND MONITORING COSTS $12,740,328 <br /> Notes: <br /> See Attachment No.1 for labor and equipment rates per hour utilized in the development of Post-Closure Cost Estimate. The material <br /> unit prices from Table 3 were utilized to develop material costs for Items 6,7,and 10. Quantities were based on assumptions made by <br /> SWT Engineering based on our experience with other landfills. Labor and rates were obtained from the State of California Industrial <br /> Relations;prevailing wage schedule pursuant to California Labor Code Part 7,Chapter 1,Article 2,Sections 1770,1773,and 1773.1. <br /> Equipment rental rates were obtained from the CalTrans Labor Surcharge and Equipment Rental Rates effective April 1,2007 through <br /> March 31,2008. SWT was also provided current invoices/costs for all environmental services currently being conducted by Forward <br /> Landfill for the period of January 2007 through January 2008 for consideration and use in developing this post-closure cost estimate. <br /> (1)Cost assumptions for system maintenance/repair include labor(Sr.Engineering Technician),a pick-up truck,gas meter,tools, <br /> miscellaneous items,Backhoe(CAT 4468)and materials to replace up to 4 collection wells per year to average depth of 150 feet. <br /> Cost assumption for system monitoring/testing includes labor(Sr.Engineering Technician),gas meter,sampling materials,pick-up <br /> truck,flare source testing,laboratory,management by Sr.Engineer(based on a review of current rates for professional consulting <br /> firms)and reporting per regulations. <br /> (2)Cost assumption for system maintenance/repair includes labor(Sr.Engineering Technician)equipment(pick-up truck,tools, <br /> pump,etc.)and replacement of one monitoring well every two years based on the following:$8,700 for similar well 50-feet deep <br /> including permit at$500 and geologging at$2,000. <br /> Cost assumptions for system monitoring includes labor(Sr.Engineering Technician),pick-up truck,sampling equipment,laboratory, <br /> management by a Sr.Geologist(based on a review of current rates for professional consulting firms),analysis by a geologist and <br /> preparation of necessary reports for the RWQCB. <br /> (3)Cost assumptions for system operation and maintenance include labor(Sr.Engineering Technician),a pick-up truck,tools,parts, <br /> electricity,and filter mediums. <br /> (4)Cost assumptions for system maintenance/repair include labor(Sr.Engineering Technician),a pick-up truck,tools,miscellaneous <br /> items,and materials. <br /> Cost assumption for system monitoring/testing includes labor(Sr.Engineering Technician),gas meter,sampling materials,pick-up <br /> truck,laboratory,management by Sr.Engineer(based on a review of current rates for professional consulting firms),analysis by a <br /> geologist,and reporting per regulations. <br /> (5)Cost assumptions for system maintenance/repair include labor(Sr.Engineering Technician),a pick-up truck,tools,miscellaneous <br /> items,and materials. <br /> Cost assumption for system monitoring/testing includes labor(Sr.Engineering Technician),sampling materials,pick-up truck, <br /> laboratory,management by Sr.Engineer(based on a review of current rates for professional consulting firms),analysis by a geologist, <br /> and reporting per regulations. <br /> (6)Cost assumptions for system maintenance/repair include labor(Sr.Engineering Technician,heavy equipment operators),a pick-up <br /> truck,tools,miscellaneous items,loader(CAT 966G),dozer(CAT D8-N),dump truck(22 tons),a 3,000-gallon water truck,and <br /> materials to replace 1 acre each of lined and unlined final cover. <br /> (7)Cost assumptions for system maintenance/repair include labor(Sr.Engineering Technician),a pick-up truck,tools,miscellaneous <br /> items,and materials to provide rodent control and hydroseeding and add soil amendments to 1 acre of final cover each year. <br /> (8)Cost assumptions for system maintenance/repair include labor(Sr.Engineering Technician),a pick-up truck,tools,miscellaneous <br /> items,Motorgrader(CAT 14-H),and materials to repair 100 If of access road each year. <br /> ® (9)Cost assumptions for system maintenance/repair include labor(Sr.Engineering Technician),a pick-up truck,high-pressure sprayer, <br /> tools,Backhoe(CAT 4466)and materials to replace up to 150 If of perimeter channel and 100 If of 24"HDPE downdrain pipe each <br /> year. <br /> (10)Cost assumptions for system maintenance/repair include labor(Sr.Engineering Technician),a pick-up truck,tools,and materials <br /> to replace up to 100 If of fencing each year. <br /> Z:\PROJECTSWIIied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\Table 4 Post Clos:7/10/2008 Page 3 of 3 <br />