Laserfiche WebLink
FORWARD LANDFILL <br /> PRELIMINARY CLOSURE/POST-CLOSURE MAINTENANCE PLAN <br /> AMENDMENT <br /> TABLE OF CONTENTS <br /> Figure 4 Closure Stage IV <br /> Figure 5 Closure Stage V <br /> Figure 6 Closure Stage VI <br /> Figure 7 Closure Stage VII <br /> Figure 8 Closure Stage VIII <br /> Figure 9 Final Cover Transition Between Lined Area Stages Typical Bench Detail <br /> TABLES <br /> Table 1 Staged Closure Matrix <br /> Table 2 Closure Implementation Schedule - 187.6-Acre Closure Area <br /> Table 3 Closure Cost Estimate Summary - 187.6-Acre Closure Area <br /> Table 4 Annual Post-Closure Maintenance and Monitoring Cost Estimate Summary <br /> ATTACHMENT <br /> Attachment 1: Stage I Closure Area Site Life Calculations <br /> Attachment 2: Stage IA Partial Final Closure/Post-Closure Maintenance Plan <br /> (dated June 2005) - Text/Tables/Figures only <br /> is <br /> Forward Landfill-PCPCMP Amendment No.3 <br /> Z:\PROJECTS\Allied waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\TOC Final.docx <br /> Amend.No.3:7/10/2008 <br />