1.0 PRELIMINARY CLOSURE PLAN AMENDMENT <br /> 1.1 Introduction <br /> The following Preliminary Closure/Post-Closure Maintenance Plan Amendment <br /> (PCPCMP)for Forward Landfill (FL) updates the existing Preliminary Plan prepared by <br /> Bryan A. Stirrat& Associates, Inc. (BAS), Lewis Engineering, and GeoLogic Associates <br /> (GLA) (2002) and the subsequent revision submitted in 2004 (Amendment No. 2). <br /> Specifically, Amendment No. 2 included language regarding the phased closure <br /> (partial closure) of the site including the associated reduction to the maximum extent <br /> of the landfill ever requiring closure, as well as, the accompanying closure cost <br /> estimate. Pursuant to CCR Title 27 (27 CCR), Section 21790(a), the purpose of a <br /> Preliminary Closure Plan is to provide a basis to establish a preliminary estimate of <br /> closure costs and post-closure maintenance costs for the landfill. The 2002 <br /> PCPCMP met this requirement; however,the objective of Amendment No. 2 is to <br /> identify the information to gain agency approval. The information listed below is <br /> included in this PCPCMP Amendment: <br /> • Engineering Design Plans (Closure Sequencing Plans) presenting the <br /> anticipated staged closure of the FL, which also shows existing and proposed <br /> final limits of waste placement (liner area); <br /> • An estimate of the maximum extent of the landfill that will ever require <br /> closure at any given time during the life of the landfill based on the Staged <br /> Closure Sequencing Plans; <br /> • Anticipated closure schedule for the initial closure stage based on volumetric <br /> calculations; and <br /> • A revised closure cost estimate based on the maximum extent of the landfill <br /> ever requiring closure as based on the Closure Sequencing configuration. <br /> This 2008 revision (Amendment No. 3) provides updated information reflecting the <br /> implementation of the Stage IA closure and post-closure cost estimates prepared in <br /> compliance with 27 CCR and the subsequent reduction of the maximum extent of <br /> area ever needing closure over the active life of the landfill. <br /> 1.2 Closure Sequencing <br /> The staged closure of the FL will be performed in accordance with the applicable <br /> regulatory standards included in 27 CCR, Chapters 3 and 4 and 40 CFR, Subpart F. <br /> The closure sequencing for the FL will be implemented in eight stages (Stages I <br /> through VIII) as shown on Figures 1 through 8. The closure cost estimate is <br /> described in Section 1.8 of this document. The components and systems required <br /> for the staged closure of the FL include the final grading plan, final cover design, <br /> 1 <br /> Forward Landfill-PCPCMP Amendment <br /> (Z:\PROJECTS\Allied Waste\)N81013 5 yr Review Plan\PCPCMP Amend 3 July 08\Clos Amend 3 Final.doc; <br /> Amendment No.3:7/1/2008) <br />