My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2009_13
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2009_13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:32 PM
Creation date
7/3/2020 10:54:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009_13
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2009_13.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
622
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Disposal Of Purge Water <br /> C}nly very low levels of either metaMe or organic tanuminants have been detected in some <br /> of <br /> the wells downgrs4ent of WMU A. Because these levels are very-low, thenis not sufficient <br /> -reason to conWncrize the purge water. Should theanalytical results indicate a need to <br /> cAntain¢rize,Clic fallowing procedurewill be <br /> Sample purge water gencraatcd during well purging, and excess water generated dozing <br /> s4mpling, will be placed in a trailer mounted tank attached to- the sampling vehicle. <br /> • When the tank is f+ull,Ac groundwater will be pmxqxd from the tank to an onsite leachate <br /> evaporation pond. After the groundwaw sampling round is complettd the tank will be <br /> filled with approximately 100 gallons of water from the water truck fill station_•This <br /> water will then be recirculated in the tank and pump to erase the system.. The rinse water <br /> will Bien be discharged to the leachate-evaporation pond.. <br /> Domestic Well - <br /> The domestic well sampled (DAT 9690) contains.a-submersible pump with:an in--line presswe <br /> tank and switch to activate the pump once'thc_ below a certain valuer. Zhe_ mplc <br /> Point for-DW-9690 was a spigotdirtcily attached to the tank Water samples were not <br /> collected directly from the-well because the aboveg-round plumbing and submersible pumps - <br /> would need.to be removed- Prior to collecting thc- es,the pump was.allowed to run - <br /> forapproximately 30 minutes to parge the water sysu=and draw groundwater from-&e aquifer_ <br /> During sampling, the pumps cycled on-off became the pumping rate exbxded the s 3jgot <br /> discharge: - - <br /> .LANDFILL GAS <br /> Landfill gas monitoring at Famrard Landf W consists of monitoring gas in the ten mterun gas <br /> probes and in buildings located at the landU Acility <br /> 33-483844-F01123 IOlt32S A-t] 3u 14,2004 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.