Laserfiche WebLink
Upper Northern Portion of WMU FU-08 September 2009 <br /> Forward Landfill Project No.021605.09 <br /> August, 2009, and substantially completed by September 18, 2009, and consisted of <br /> the construction of the leachate collection system and appurtenances. <br /> 2.3 Project Personnel <br /> The following personnel participated in the construction of the upper northern <br /> portion of WMU FU-08. <br /> PROJECT ROLE ORGANIZATION NAME <br /> Owner Forward Inc. Don Litchfield <br /> Reuben Ramirez <br /> Earthworks Contractor Guinn Construction Larry Simms <br /> Geosynthetics Contractor Comanco Gilberto Bello <br /> Surveying RJA Surveying, Inc. Buck Buxton <br /> Design Engineer Lewis Engineering Sangeeta Lewis, PE <br /> CQA Project Manager/Certifying Vector Engineering, Inc. Monte Christie, PE, <br /> Engineer GE <br /> Lead CQA Monitor Vector Engineering, Inc. Steve Rosbach <br /> Third Party Geosynthetics Lab TRI Environmental Lab Mansukh Patel <br /> Vector Engineering,Inc.• 143E Spring Hill Drive•Grass Valley,CA 95945•(530)272-2448 <br /> -4- <br />