Laserfiche WebLink
Upper Northern Portion of WMU FU-08 September 2009 <br /> Forward Landfill Project No.021605.09 <br /> materials met the requirements of the project specifications. The conformance test <br /> results are included in Appendix D. <br /> 4.4 Geogrid <br /> 4.4.1 General <br /> A geogrid was used as a reinforcement layer on the bench area to support the <br /> overlying liner section. <br /> 4.4.2 Receiving Inspection <br /> Upon arrival by truck shipment, Vector's CQA Monitor observed the unloading and <br /> storage of the geogrid rolls. A sample of the geogrid was tested for tensile <br /> properties (ASTM D6637). A copy of the geogrid conformance testing data is <br /> included in Appendix O. <br /> 4.4.3 Deployment <br /> The geogrid deployment procedure was observed and documented by Vector's CQA <br /> Monitor. The CQA Monitor observed that the conditions of the CQA manual were <br /> met during deployment. Vector's CQA monitor observed that proper seam overlap, <br /> seaming, tie-ins, and other manufacturer's written guidelines were followed. <br /> Vector Engineering, Inc. - 143E Spring Hill Drive-Grass Valley,CA 95945•(530)272-2448 <br /> -16- <br />