Laserfiche WebLink
Upper Northern Portion of WMU FU-08 September 2009 <br /> Forward Landfill Project No.021605.09 <br /> 4.7 Protective Operations Soil <br /> Vector's CQA Monitor observed the placement of the protective soil layer on the <br /> northern portion of WMU FU-08. Upon verification of the drainage layer thickness, <br /> a geotextile filter was placed and a 12-inch protective operations layer was placed <br /> over the geotextile. Vector's CQA Monitor observed placement of the materials to <br /> ensure that the placement activities did not damage the underlying geosynthetics. <br /> Upon completion of the protective soil layer, a survey was completed by Centerline <br /> Surveying. A copy of the as-built survey has been included in Appendix G. <br /> Vector Engineering, Inc.- 143E Spring Hill Drive-Grass Valley,CA 95945-(530)272-2448 <br /> -22- <br />