Laserfiche WebLink
Upper Northern Portion of WMU FU-08 September 2009 <br /> Forward Landfill Project No.021605.09 <br /> 5.0 CONCLUSION <br /> The completion of construction work requiring CA observation occurred from early <br /> August through September 16, 2009. Based on our observations and testing during <br /> the construction of the northern portion of WMU FU-08 liner system at the Forward <br /> Landfill, it is Vector's professional judgment that the construction was completed in <br /> general accordance with the project plans and specifications, CQA plan, applicable <br /> regulations, and approved design modifications. <br /> Vector Engineering,Inc. - 143E Spring Hill Drive-Grass Valley,CA 95945-(530)272-2448 <br /> -23- <br />