Laserfiche WebLink
VECTOR <br />ENGINEERlNO INC. <br />0 DAILY ♦ r REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />FU -08 Upper Portion <br />021605.09 <br />005 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, CA <br />Forward Landfill <br />7 Aug09 <br />Friday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />Comanco <br />Monte Christie <br />Superintendent: <br />Liner Superintendent: <br />Hours: <br />Larry Sims <br />N/A <br />07:00 am to 16:30 pm <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />On -Site Engineered Fill <br />Sunny, 90'S <br />I <br />Steven Rosbach <br />Equipment on site: <br />Contractor morning meeting: <br />N/A <br />AAAAIARARAAAAIAI®AI/IIIpAIAAAl1AAA�AAAAAAAIAAo•AA AA®p ■ <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />EARTHWORKS <br />Guinn continued to grade the subgrade. They also filled and graded around the berms and the geogrid area. <br />Prepared By: Steven Rosbach Title: Senior Engineering Technician Date: 08/07/09 <br />Reviewed By: ( Title: <br />0 <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />Date: <br />