Laserfiche WebLink
rCTOR <br />INEERING, INC. <br />0 DAILY CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />FU -08 Upper Portion <br />021605.09 <br />006 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, CA <br />Forward Landfill <br />10 Aug09 <br />Monday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />Comanco <br />Monte Christie <br />Superintendent: <br />Liner Superintendent: <br />Hours: <br />Larry Sims <br />N/A <br />06:00 am to 14:30 pm. <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />On -Site Engineered Fill <br />I sunny, loo's <br />Steven Rosbach <br />Equipment on site: <br />CAT 420D Combination Loader (1); CAT 966F Front -End Loader (1); CAT CS54 Smooth Drum Compactor (1); CAT D6N Dozer, <br />GPS -Equipped (1); CAT 637 Scrapers (3); CAT TL943 Forklift (1); CAT 143H Grader (1), Water Truck (1) <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />EARTHWORKS <br />N/A <br />®LINER <br />Guinn Construction and Allied Waste laborers placed geogrid in the designated geogrid area in the southwest section <br />of FU -08, Upper Portion. They used geogrid that Allied had left over from previous projects. Vector confirmed that <br />the geogrid used was Tensar Corporation Product Code UX 110070, which conforms with the project specifications. <br />Approximately 2/3's of the area was covered before they ran out of geogrid. <br />The CAT 143H Grader, CAT CS54 Smooth Drum Compactor, and CAT 420D Combination Loader were used to <br />assist in placement of the geogrid. The Grader and Combination Loader were used to backfill the outer anchor trench <br />once the geogrid rolls were in place. The Smooth Drum roller and Grader were used to smooth out the subgrade ahead <br />of the geogrid placement. <br />Prepared By: Steven Rosbach <br />Reviewed By: <br />0 <br />ML <br />Title: Senior Engineering Technician <br />Title: <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />Date: 08/10/09 <br />Date: <br />