Laserfiche WebLink
Jr/7 <br />ECTOR <br />ENGINEERING, INC. <br />0 DAILY CONSTRUCTIONâ–ş REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />FU -08 Upper Portion <br />021605.09 <br />018 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, CA <br />Forward Landfill <br />I Tuesday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />Comanco <br />Monte Christie <br />Superintendent: <br />Liner Superintendent: <br />Hours: <br />Larry Sims <br />Gilberto Bello <br />06:00 am to 17:00 pm <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />On -Site Engineered Fill <br />I sunny, 90's <br />Steven Rosbach <br />Equipment on site: <br />CAT 420D Combination Loader (1); CAT 966F Front -End Loader (1); CAT CS54 Smooth Drum Compactor (1); CAT D6N Dozer, <br />GPS -Equipped (1); CAT 637 Scrapers (3); CAT TL943 Forklift (1); CAT 143H Grader (1); Water Truck (1) <br />Contractor morning meeting: <br />N/A <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Guinn continued placing geotextile and drainage gravel on the West side of FU -08 Upper, using the belt conveyor to <br />put the gravel onto the textile, and the D6 GPS -equipped dozer to spread it to not less than 6 inches thick. Grade <br />heckers continued to check the grade ahead of the gravel placement. <br />Guinn received and placed a total of approximately 1400 cubic yards of drainage gravel today, for a total of <br />approximately 8878 cubic yards placed on the textile to date, and another 230 yards stockpiled. <br />N/A <br />Prepared By: Steven Rosbach <br />Reviewed By: <br />0 <br />Title: Senior Engineering Technician <br />/0M Title: <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />Date: 08/25/09 <br />Date: <br />