Y17ECTOR <br />ENGINEERING INC. <br />0 DAILY CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />FU -08 Upper Portion <br />021605.09 <br />019 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, CA <br />Forward Landfill <br />26 Aug09 <br />Wednesda <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />Comanco <br />Monte Christie <br />Superintendent: <br />Liner Superintendent: <br />Hours: <br />L Sims <br />Gilberto Bello <br />06:00 am to 17:00 prn. <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />On -Site Engineered Fill <br />I Sunny, 90'S <br />I Steven Rosbach <br />Equipment on site: <br />CAT 420D Combination Loader (1); CAT 966F Front -End Loader (1); CAT CS54 Smooth Drum Compactor (1); CAT D6N Dozer, <br />GPS-Eauinned (2): CAT 637 Scrapers (3); CAT TL943 Forklift (1); CAT 143H Grader (1); Water Truck 1) <br />Contractor morning meeting: <br />N/A <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Guinn constructed the final section of the south berm, where the access ramp is located. They placed fill in lfoot thick <br />lifts and compacted each lift by wheel rolling with scrapers, and track -walking with the D6 dozer. Guinn also <br />6 xcavated the toe ditch inside the berm with the CAT 420D combination loader. <br />Once the berm was completed and compacted, Guinn placed the final panel of geomembrane rain flap over the berm, <br />extending the edges out a few feet past where it will be welded to the already -deployed sheets of geomembrane. <br />Guinn then placed the pipe and coarse gravel in the toe ditch and wrapped it in geotextile as shown in the project <br />drawings. Guinn then placed the geotextile down on the subgrade, placed the drainage gravel, and placed the overlying <br />geotextile over the area immediately around that section of FU -0. Once this was completed, Guinn placed <br />approximately 3' of soil over the geomembrane to build a new access road into the cell. <br />Guinn then started bringing in protective operations layer soil from the borrow area immediately south of FU -08, using <br />a scraper. Guinn rolled out sheets of geotextile over the drainage gravel, overlapping each sheet approximately 6 <br />inches, and heat tacking them together continuously with a propane torch. The protective cover soil was then placed <br />over this soil, pushed out to a one -foot thickness with a D6 dozer equipped with GPS. <br />Guinn received and placed no drainage gravel today, for a total of approximately 27,199 cubic yards placed on the <br />textile to date, and another 700 yards stockpiled. <br />kl; <br />N/A <br />Prepared By: Steven Rosbach <br />Reviewed By: <br />0 <br />Title: Senior Engineering Technician Date: 08/26/09 <br />Title: <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />Date: <br />