Laserfiche WebLink
TZECTOR <br />IV ENGINEENING, INC. <br />DAILY0 CONSTRUCTION.O. <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />FU -08 Upper Portion <br />021605.09 <br />020 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, CA <br />Forward Landfill <br />27 Aug09 <br />Thursday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />Comanco <br />Monte Christie <br />Superintendent: <br />Liner Superintendent: <br />Hours: <br />Larry Sims <br />Gilberto Bello <br />06:00 am to 17:00 prn <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />On -Site Engineered Fill <br />Sunny, 90's <br />I <br />Steven Rosbach <br />Equipment on site: <br />CAT 420D Combination Loader (1); CAT 966F Front -End Loader (1); CAT CS54 Smooth Drum Compactor (1); CAT D6N Dozer, <br />GPS -Equipped (2); CAT 637 Scrapers (3); CAT TL943 Forklift (1); CAT 143H Grader (1); Water Truck (1) <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />EARTHWORKS <br />Guinn continued to bring in protective operations layer soil from the borrow area immediately south of FU -08, using a <br />scraper. Guinn rolled out sheets of geotextile over the drainage gravel, overlapping each sheet approximately 6 inches, <br />and heat tacking them together continuously with a propane torch. The protective cover soil was then placed over this <br />0 oil, pushed out to a one -foot thickness with a D6 dozer equipped with GPS. <br />Guinn also continued placing drainage gravel today, placing bucetloads placed by the front end loader from the <br />stockpile of gravel already onsite. They have placed a total of approximately 27,199 cubic yards placed on the textile <br />to date, and another 700 yards stockpiled. <br />N/A <br />Prepared By: Steven Rosbach Title: Senior Engineering Technician Date: 08/27/09 <br />Reviewed By: /M Title: <br />0 <br />4/23/03, Rev. 0 <br />C-2 <br />lofl <br />Date: <br />