M,, <br />x <br />4Q lt-up and commissioning <br />Starf=u and commissioning with the GE Jenbacher start-up and commissioning checklist must be ordered <br />separately. <br />4.06 Trial run <br />After start-up and commissioning, the plant will be tested in an 8 -hour trial run. The operating personnel will <br />be introduced simultaneously to basic operating procedures. <br />4.07 Emission measurement (exhaust gas analyser) <br />Emission measurement by GE Jenbacher personnel, to verify that the guaranteed toxic agent emissions have <br />been achieved (costs for measurement by an independent agency will be an extra charge). <br />Electrical: <br />• Genset: <br />• At terminals of genset interface panel <br />• At terminals of generator terminal box <br />(screwed glands to be provided locally) <br />• Genset control panel: <br />At terminal strips <br />• Auxiliaries: <br />At terminals of equipment which is supplied separately <br />Cooling water <br />At inlet and outlet flanges on genset <br />Exhaust gas <br />At the exhaust gas exit of the engine <br />Combustion air <br />The air filters are set mounted <br />Fuel gas <br />• At inlet and outlet flange of gas train <br />• At inlet flange of gas pipework on genset <br />• At outlet flange of the pre -chamber gas train <br />• At inlet flange of pre -chamber gas pipework on genset <br />• At connection for boost pressure compensation on genset <br />• At connection for boost pressure compensation on gas pressure regulator of the pre -chamber gas train <br />Lube oil <br />At lube oil connections on genset <br />Draining connections and pressure relief <br />At genset <br />19.04.20112 TS JGS616 E22 4160V April 19 2011 Ameresco Forward LFG-WES <br />30/32 <br />