My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_19
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2011_19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 8:35:34 PM
Creation date
7/3/2020 10:56:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_19
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2011_19.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M,, <br />x <br />4Q lt-up and commissioning <br />Starf=u and commissioning with the GE Jenbacher start-up and commissioning checklist must be ordered <br />separately. <br />4.06 Trial run <br />After start-up and commissioning, the plant will be tested in an 8 -hour trial run. The operating personnel will <br />be introduced simultaneously to basic operating procedures. <br />4.07 Emission measurement (exhaust gas analyser) <br />Emission measurement by GE Jenbacher personnel, to verify that the guaranteed toxic agent emissions have <br />been achieved (costs for measurement by an independent agency will be an extra charge). <br />Electrical: <br />• Genset: <br />• At terminals of genset interface panel <br />• At terminals of generator terminal box <br />(screwed glands to be provided locally) <br />• Genset control panel: <br />At terminal strips <br />• Auxiliaries: <br />At terminals of equipment which is supplied separately <br />Cooling water <br />At inlet and outlet flanges on genset <br />Exhaust gas <br />At the exhaust gas exit of the engine <br />Combustion air <br />The air filters are set mounted <br />Fuel gas <br />• At inlet and outlet flange of gas train <br />• At inlet flange of gas pipework on genset <br />• At outlet flange of the pre -chamber gas train <br />• At inlet flange of pre -chamber gas pipework on genset <br />• At connection for boost pressure compensation on genset <br />• At connection for boost pressure compensation on gas pressure regulator of the pre -chamber gas train <br />Lube oil <br />At lube oil connections on genset <br />Draining connections and pressure relief <br />At genset <br />19.04.20112 TS JGS616 E22 4160V April 19 2011 Ameresco Forward LFG-WES <br />30/32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.