My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_19
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2011_19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 8:35:34 PM
Creation date
7/3/2020 10:56:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_19
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2011_19.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fi <br />InSUlatiQn ��� <br />Insutatiori of heat exchangers, pipework and exhaust gas silencer is not included in our scope of supply and <br />must be provided locally. <br />First filling <br />The first filling of genset, (lube oil, engine jacket water, anti freeze-, anti corrosive agent, battery acid) is not <br />included in our scope of supply. <br />The composition and quality of the used consumables are to be strictly monitored in accordance with the <br />"Technical Instructions" of GE JENBACHER. <br />Suitable bellows and flexible connections must be provided locally for all connections. <br />Cables from the genset must be flexible. <br />5.02 Factory tests and inspections <br />The individual module components shall undergo the following tests and inspections: <br />5.02.01 Engine tests <br />Carried out as combined Engine- and Module test according to DIN ISO 3046 at GE Jenbacher test bench. <br />The following tests are made at 100%, 75% and 50% load, and the results are reported in a test certificate: <br />• Engine output <br />• Fuel consumption <br />• Jacket water temperatures <br />• Lube oil pressure <br />• Lube oil temperatures <br />• Boost pressure <br />• Exhaust gas temperatures, for each cylinder <br />5.02.02 Generator tests <br />Carried out on the premises of the generator supplier. <br />PKIM111 art ST m C: <br />The engine will be tested with natural gas (Russian Natural gas with methane number 94). The technical data <br />according to the specification can only be demonstrated to a certain extent with the available natural gas. <br />Carried out as combined Engine- and Module test commonly with module control panel at GE Jenbacher test <br />bench, according to ISO 8528, DIN 6280. The following tests are made and the results are reported in a test <br />certificate: <br />Visual inspection of scope of supply per specifications. <br />• Functional tests per technical specification of control system. <br />• Starting in manual and automatic mode of operation <br />• Power control in manual and automatic mode of operation <br />• Function of all safety systems on module <br />• Measurements at 100%, 75% and 50% load: <br />• Frequency <br />• Voltage <br />• Current <br />19.04.2011/2 TS JGS616 E22 4160V April 19 2011 Ameresco Forward LFG-WES <br />31132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.