My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_19
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2011_19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 8:35:34 PM
Creation date
7/3/2020 10:56:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_19
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2011_19.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced <br />ABUTEC- <br />Burner <br />Technologies <br />II. Design Basis <br />Flare Gas Stream <br />CONFIDENTIAL AND PROPRIETARY I <br />Type: <br />Regeneration Vent Gas <br />Composition: <br />99.9% Air ' <br />Balance of VOC's and Trace Organic Compounds <br />Temperature: <br />200-450 deg F <br />Flow Rate: <br />1,900 scfin <br />Auxiliary Fuel Requirements <br />130 scfm (Estimate based on Landfill Gas at 47% CH4) ; additional fuel <br />(not to exceed 200 scfm at 47% CH4) may be required to sustain 1850 <br />deg F for lower emissions. <br />Exhaust Gas Flow Rate (Max) <br />2,267 scfm (total) <br />Exhaust Gas Flow Rate (Max) <br />10,653 acfin (total) <br />Exhaust Gas Temperature <br />1,850 deg F <br />Lambda Value <br />2.3 (excess air ratio) <br />Burner Size <br />5.64 million BTU/hr (1.65MW)—HHV <br />Inlet Pressure Requirements <br />0.75 psig <br />Turndown Ratio <br />4:1 <br />Mechanical <br />Design Wind Speed 100 mph <br />Ambient Temperature 0 deg F up to 120 deg F <br />Electrical Area Classification General Area Classification (non -hazardous) <br />Elevation Ground Level <br />Process <br />Smokeless Capacity <br />Operating Temperature <br />Retention Time <br />Flare Inlet Pressure <br />Utilities <br />Pilot Gas <br />Electricity <br />Auxiliary Fuel <br />100% <br />1500 deg F to 2100 deg F (1800 deg F Nominal); <br />1.0 sec <br />1.5 psi (Max Design Inlet Pressure) <br />7 psi (Max Allowable Working Pressure) <br />68 scfh of Propane <br />1 Phase, 60 Hz, 120V / 20A <br />Landfill Gas supplied at 1.5 psi <br />Page 4 of 14 Documents/Quotations/2010.203.002AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.