My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_25
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2011_25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 12:45:50 AM
Creation date
7/3/2020 10:56:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_25
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2011_25.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> low Facility Number: <br /> SOLID WASTE FACILITY PERMIT 39-AA-0015 <br /> s. The pre-processed treated auto shredder waste must be deployed in a manner that does not allow the mixing of the cover and the <br /> waste. The pre-processed treated auto shredder waste cannot be used during rainy weather or anticipated rainy weather. <br /> t. The ash and cement kiln dust must be applied in such a manner as not to create voids or dust. <br /> u. For shredded green material ADC,the following conditions must be met: <br /> ® A track dozer is to be used to spread and compact the green material. <br /> ® The processed green material shall not contain greater than five(5)percent contamination(plastic or paper bags,mix solid <br /> waste,or construction and demolition waste). <br /> ® The processed green material must have a minimum thickness of 6 inches and an average compacted thickness of 12 inches <br /> v. The use of the ADC shall conform to all conditions of the ADC demonstration project as approved by the LEA and maybe <br /> suspended or modified at any time for sufficient cause. <br /> w. If the site operator plans to use a new ADC,allowed by and described in,Title 27,CCR, Section 20690,the operator must <br /> submit any proposed changes to the ADC program in the form of an RFI amendment 180 days prior to the anticipated change. <br /> x. The LEA reserves the right to require additional measures to adequately control nuisances resulting from landfilling activities as <br /> needed. <br /> y. The operator shall at all times provide adequate staffing to deal effectively and promptly with operations at the site as needed. <br /> z. The operator shall provide at all time adequate numbers and types of operable equipment for compaction and placement of the <br /> waste and cover at the facility. <br /> aa. An adequate water supply for dust and fire suppression shall be available at all times during the operation of this facility. The <br /> water supply must be acceptable to the local fire jurisdiction and the LEA. <br /> bb. Additional information concerning the design and operation of the facility shall be furnished upon request and within the time <br /> frame specified by the LEA. The operator must supply the LEA with any information the LEA deems necessary to conduct an <br /> inspection or to review and rewrite a Solid Waste Facility Permit. <br /> cc. The LEA must receive written notification from the facility operator 48 hours prior to operating on the seventh day of that week. <br /> dd. There shall be no landfill activities,waste placement,disposal,composting,storage of equipment,or soil borrowing in the buffer <br /> area. <br /> cc. The Forward Inc.personnel shall monitor the adjacent creeks for litter and unauthorized discharge weekly and during storm <br /> events.The Forward Inc. personnel shall remove litter and take appropriate measures to prevent unauthorized discharge from <br /> getting into the creek. <br /> Page 5 of_` <br />
The URL can be used to link to this page
Your browser does not support the video tag.