Laserfiche WebLink
'oPqu�p CO <br />G <br />2 <br />.Z <br />Ul: X <br />CALrF„OR.P <br />San Joaquin County <br />Environmental Department <br />600 <br />;- <br />ri East Main Street <br />Stockton,California95202-3029 <br />Website: www.sjgov.org/ehd <br />Phone: (209) 468-3420 <br />Pax: (209) 464-0138 <br />February 10, 2009 <br />Kevin Basso, General Manager <br />Forward Inc., Landfill <br />P. O. Box 6336 <br />Stockton, CA 95206 <br />DIRECTOR <br />Donna Heran, REHS <br />ASSISTANT DIRECTOR <br />Laurie Catulla, REHS <br />PROGRAM COORDINATORS <br />Mike Huggins, REHS, RDI <br />Margaret Lagorio, REHS <br />Robert McCleilon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />Subject: Title 27 Compliance Review, Perimeter Probe Monitoring Network, Forward Landfill <br />Dear Mr. Basso, <br />The Environmental Health Department (EHD) has received and reviewed the above referenced . <br />plan. The plan indicates that -the following gas probe (GP) distances are marginal: <br />• GP 1 and GP 25 <br />• GP 3 and GP 4 <br />• GP 16 and GP 17 <br />• GP 24 and GP 25 <br />The EHD and your staff conducted a survey to measure the actual distances between the gas <br />probe in question. The results are as follows: <br />• The distance between GP 1 and GP 25 is 1000 feet <br />• The distance between GP 3 and GP 4 is 998.5 feet <br />• The distance between GP 16 and GP 17 is 1008 feet <br />• The distance between GP 24 and GP 25 is 1010 feet <br />In the revised plan dated December 8, 2008, -you agreed to install a new gas probe between GP 1 <br />and GP 25. The distance between those wells meet state minimum standards. The structure across <br />the street from the entrance is still a concern, but because current land filling activity is over 1000 <br />feet away and the gas probes nearest the structure (GP 1, GP 2, GP 25 or GP 24) have not <br />contained a measureable amount of methane during quarterly monitoring events, the EI•ID will <br />allow the proposed probe location (GP 26) to be moved to a location between GP 24 and GP 25 <br />with the following condition. When a landfill cell is constructed within 1000 feet of the structure, <br />the facility must install an additional gas probe. The new gas probe must be installed between <br />GP25 and GP 1. This condition will be added to the new permit for the proposed expansion for <br />the facility. <br />