Laserfiche WebLink
Forward Landfill <br />is Title 27 Compliance Review <br />C <br />Page 2 <br />February 10, 2009 <br />The distance currently between GP 16 and GP 17 is over 1000 feet and require that an additional <br />gas probe be installed. This should be completed at the same time as the new gas probe between <br />GP 24 and GP 25. A permit for installation and site activities need to be completed prior to <br />September 21, 2009. <br />If you have any question regarding this matter, you can call me at (209) 468-0332 <br />Sincerely, <br />Robert McClellon, REHS <br />Program Coordinator RENS <br />c: GinoYetka, CIWMB 1OA- I8 <br />Tadese Gebre-Hawariat. CIWMB MS IOA- 17 <br />Joy Isaacson, CIWMB MS 1 OA -15 <br />Don Litchfield, Forward Landfill Inc. <br />Michael O'Connor, SCS Engineers <br />