My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_27
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2011_27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 8:38:02 PM
Creation date
7/3/2020 10:56:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_27
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2011_27.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4-1 <br /> 4.0 POST-CLOSURE MAINTENANCE PLAN <br /> 4.1 Introduction <br /> Post-closure maintenance of the FL Stage 113 Partial Final Closure area will be performed in <br /> accordance with applicable regulatory standards included in 27 CCR, Chapters 3 and 4, and <br /> 40 CFR Section 258.61. Maintenance activities for the Stage 113 Partial Final Closure Area <br /> of the FL will consist of: <br /> ♦ Final Cover Maintenance <br /> ♦ Drainage System Maintenance <br /> ♦ Vegetative Cover Maintenance <br /> ♦ Bench Maintenance <br /> ♦ Landfill Settlement Monitoring and Monument Maintenance <br /> The 30-year post-closure maintenance period for this area will not commence until the final <br /> closure project for the entire site is completed. Therefore, the time period between final <br /> closure of Stage 1B and the entire site does not count toward the 30-year (minimum) <br /> post-closure monitoring and maintenance period for Stage 1B in accordance with 27 CCR, <br /> Section 21180(a). For additional details regarding post-closure maintenance procedures, <br /> also refer to the FL Preliminary Closure and Post-Closure Maintenance Plan (PCPCMP) (SWT, <br /> dated 2008). <br /> ® The maintenance procedures for each of these activities are described in the following <br /> sections. Please note that landfill gas monitoring and control system maintenance, <br /> groundwater monitoring, and site security for those facilities in the Stage 1B partial closure <br /> area will be performed/maintained as part of ongoing landfill operations. <br /> 4.2 Final Cover Maintenance <br /> The integrity and effectiveness of the final cover will be maintained by making repairs, if <br /> necessary, to correct the effects of settlement, subsidence, erosion, or damage to the <br /> vegetation. Areas that show evidence of damage will be investigated to ascertain the cause <br /> of the damage before repairs are undertaken. If the damaged areas have caused ponding <br /> of surface runoff, soil will be added as needed and regraded until positive drainage is <br /> re-established. Additional final cover will be placed in accordance with the CQA Plan <br /> included as Appendix C of this document. If the repaired area is large enough, it will be <br /> revegetated. Inspections of the final cover will be performed on a quarterly basis. <br /> 4.3 Drainage System Maintenance <br /> Post-closure maintenance personnel at the landfill will inspect and maintain the drainage <br /> system within the Stage 1B Partial Final Closure on a quarterly basis and after significant <br /> storm events. The effectiveness of the surface drainage control structures will be <br /> maintained by keeping drainage channels/downdrains clear of debris and excessive <br /> vegetation and by making repairs, as necessary, to correct the effects of physical damage, <br /> erosion, settlement, or other events detrimental to operation of the drainage control system. <br /> Forward Landfill Stage 113 Partial Final Closure/Post-Closure Maintenance Plan June 2011 <br /> SWT Engineering <br /> z:\projects\allied waste\forward\11-1014 partial fnl clsr pin\partial final closure plan document\text\sec 4.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.