My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_27
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2011_27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 8:38:02 PM
Creation date
7/3/2020 10:56:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_27
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2011_27.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4-3 <br /> ® controls can be provided from which to monitor future landfill settlement. After completion <br /> of the final cover, a settlement monument will be set on the landfill on the bench as shown <br /> on Figure 8. The monument will be used to monitor settlement within the Stage 113 partial <br /> closure area and will allow for a determination of the actual settlement that occurs over the <br /> post-closure maintenance period. <br /> Additionally, 27 CCR, Section 21090(e)(2) requires operators to produce iso-settlement <br /> maps every five years throughout the post-closure maintenance period or until settlement <br /> has ceased. Prior to an aerial survey, the monument will be surveyed for horizontal and <br /> vertical control so that an accurate disposal area topographic map can be developed. <br /> Aerial "targets" will be placed over the monument after the survey has been completed and <br /> an aerial topographic map will be generated to provide an up-to-date contour map of the <br /> Stage 1B Partial Final Closure area. The settlement and lateral movement of the <br /> monument will then be recorded. <br /> Prior to a scheduled survey of the monument, an inspection will be performed to ensure that <br /> the monument is intact and usable. The monument will be cleared of all debris and <br /> vegetation to allow for visual location of the monument and accurate readings. Should the <br /> monument be damaged or missing, a new monument will be placed at that location so that <br /> the continuity of the previous survey data will be maintained. <br /> If the monument is within an area requiring regrading and/or other reconstruction, it shall <br /> be replaced at approximately the same horizontal location and a note shall be placed to <br /> ® identify the new elevation. <br /> Forward Landfill Stage 113 Partial Final Closure/Post-Closure Maintenance Plan June 2011 <br /> SWT Engineering <br /> z:\projects\allied waste\forward\11-1014 partial fnl clsr pin\partial final closure plan document\text\sec 4.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.