Laserfiche WebLink
Ftell��WIQD 914 <br />RESOURCE & RECOVERY <br />WINTERIZATION PLAN 2012-2013 <br />1. Grinding Pad & Sorting Pad <br />The pad has been graded such that the water flows to the northwest <br />corner. It is then collected in a ditch and delivered to the sediment <br />pond located at the west end of the R & R area. <br />2. Compost Pad <br />Composting activities are being performed on an approximately 10 - <br />acre area. The composting activities are limited to green waste <br />materials. <br />3. Transfer Station <br />Operation of the R & R transfer station continues. The transfer of <br />recyclables is done within the twelve thousand square feet (12,000sq) <br />building located on the eastern end and middle (North-South) of the R <br />& R area. Rainwater from the roof of the building is directed from the <br />down spouts to the existing drain ditches and then to the sedimentation <br />pond. <br />4. Sediment Pond <br />All non -contact water being directed to the R&R's sedimentation pond <br />is sampled and analyzed in accordance with Forward's Storm Water <br />Pollution Prevention Plan and Storm Water Monitoring Plan. If the <br />pond is at capacity and the stormwater samples comply with the <br />discharge requirements, non -contact water is discharged to the South <br />Fork of Little Johns Creek. A log is kept on site recording the volume <br />of non -contact water discharged to the creek from the pond. <br />