Laserfiche WebLink
leachate seeps will be recorded in the inspection log. If seeps are <br />observed, the site engineer will be contacted and the cause of the seep <br />will be investigated. The LEA will also be notified. <br />Remedial measures will be designed and implemented to control leachate <br />seeps. The remedial action plan will be submitted to the LEA for review <br />and approval, prior to implementing the plan. <br />5. WMUs <br />All constructed WMUs at the site have been approved for disposal by the <br />Regional Water Quality Control Board (RWQCB). <br />6. Disposal Treatment Areas <br />The WMUs that may receive waste during the winter of 2012-2013 include <br />FU -03, FU -04, FU -05, FU -06, FU -08 Phase I, FU -08 Phase II, and FU -10. <br />7. Access <br />Roads necessary for the safe operation of Forward Landfill during <br />inclement weather are graded to promote drainage and direct water to a <br />central collection point. Roads are winterized with asphalt, road base, <br />crushed concrete, gravel and recycled asphalt. <br />A Tracinator is located along the main landfill entrance road and is used to <br />clean dirt from the truck tires. In addition, roads will be cleaned, as <br />needed, to prevent the build up of mud and tracking of mud onto Austin <br />Road. Austin Road will be cleaned, as needed, by sweeper truck and <br />water truck. <br />