Laserfiche WebLink
First Quarter 2012 <br />Table 1. Subsurface Evaluation and LFG Monitoring Probe Testing Results <br />Forward Landfill, Manteca, California <br />Job No. 07207048.00 <br />Name Date Time <br />Methane <br />(% by vol) <br />Carbon <br />Dioxide <br />(% by vol) <br />O2 <br />(% by vol) <br />Balance <br />(% by vol) <br />Rel <br />Press <br />(H2O inch)Comments <br />GP-09D 1/18/2012 10:16 0 1.2 18.4 80.4 -0.04 <br />GP-09D 1/24/2012 10:28 0 1.5 17.9 80.6 -0.05 <br />GP-09D 1/30/2012 8:23 0 1.5 17.8 80.69 0 <br />GP-09D 2/8/2012 9:30 0 1.6 17.8 80.6 -0.03 <br />GP-09D 2/15/2012 9:21 0 1.1 18.3 80.6 -0.04 <br />GP-09D 2/23/2012 9:12 0 1.3 18.4 80.29 -0.05 <br />GP-09D 3/28/2012 13:07 0 1.1 18.3 80.6 -0.01 <br />GP-09M 1/4/2012 8:06 0 0.3 19.8 79.89 -0.05 <br />GP-09M 1/11/2012 9:10 0 0.5 20.5 79 -0.08 <br />GP-09M 1/18/2012 10:18 0 0.3 19.9 79.79 -0.01 <br />GP-09M 1/24/2012 10:30 0 0.3 20 79.69 -0.08 <br />GP-09M 1/30/2012 8:24 0 0.3 19.9 79.79 -0.01 <br />GP-09M 2/8/2012 9:31 0 0.2 19.8 80 -0.03 <br />GP-09M 2/15/2012 9:23 0 0.6 20.5 78.9 -0.06 <br />GP-09M 2/23/2012 9:13 0 0.3 20.2 79.5 -0.06 <br />GP-09M 3/28/2012 13:09 0 0.9 19.3 79.8 -0.01 <br />GP-09RA 2/23/2012 11:31 0 2.1 18.1 79.8 0.01 <br />GP-09RB 2/23/2012 11:32 0 3.7 17.5 78.8 0.01 <br />GP-09RC 2/23/2012 11:33 0 1.8 15.5 82.7 0.07 <br />GP-09S 1/4/2012 8:07 0 0.3 19.9 79.79 -0.02 <br />GP-09S 1/11/2012 9:11 0 0.2 20.6 79.2 -0.03 <br />GP-09S 1/18/2012 10:19 0 0.3 19.9 79.79 0 <br />GP-09S 1/24/2012 10:31 0 0.2 19.8 80 -0.05 <br />GP-09S 1/30/2012 8:26 0 0.2 19.6 80.2 0.01 <br />GP-09S 2/8/2012 9:34 0 0.2 19.4 80.4 -0.01 <br />GP-09S 2/15/2012 9:24 0 0.2 20.5 79.3 -0.08 <br />GP-09S 2/23/2012 9:14 0 0.2 20.1 79.7 -0.03 <br />GP-09S 3/28/2012 13:10 0 0.5 12.6 86.9 0 <br />GP-10D 1/4/2012 8:10 0 0.5 19 80.5 -0.04 <br />Initial monitoring