Laserfiche WebLink
First Quarter 2012 <br />Table 1. Subsurface Evaluation and LFG Monitoring Probe Testing Results <br />Forward Landfill, Manteca, California <br />Job No. 07207048.00 <br />Name Date Time <br />Methane <br />(% by vol) <br />Carbon <br />Dioxide <br />(% by vol) <br />O2 <br />(% by vol) <br />Balance <br />(% by vol) <br />Rel <br />Press <br />(H2O inch)Comments <br />GP-10D 1/11/2012 9:14 0 0.8 12 87.2 -0.02 <br />GP-10D 1/18/2012 10:24 0 0.3 19.8 79.89 0 <br />GP-10D 1/24/2012 10:34 0 0.2 20 79.8 -0.05 <br />GP-10D 1/30/2012 8:29 0 3.8 6.4 89.8 0.01 <br />GP-10D 2/8/2012 9:37 0 0.2 19.8 80 -0.02 <br />GP-10D 2/15/2012 9:27 0 1.5 9.8 88.7 -0.01 <br />GP-10D 2/23/2012 9:17 0 3.3 6.5 90.2 0 <br />GP-10D 3/28/2012 13:16 0 0.2 20.5 79.3 -0.03 <br />GP-10M 1/4/2012 8:12 0 6.1 10.5 83.4 -0.04 <br />GP-10M 1/11/2012 9:15 0 4.9 10.3 84.8 -0.03 <br />GP-10M 1/18/2012 10:25 0 6 9.5 84.5 0.04 <br />GP-10M 1/24/2012 10:36 0 5.9 9.8 84.3 -0.04 <br />GP-10M 1/30/2012 8:30 0 6 9.7 84.3 0 <br />GP-10M 2/8/2012 9:38 0 5.8 9.6 84.6 -0.02 <br />GP-10M 2/15/2012 9:28 0 5.1 9.9 85 -0.03 <br />GP-10M 2/23/2012 9:18 0 6 9.4 84.6 0 <br />GP-10M 3/28/2012 13:17 0 5 10.8 84.2 -0.03 <br />GP-10RA 2/23/2012 11:37 0 1.2 19 79.8 0.08 <br />GP-10RB 2/23/2012 11:39 0 1.7 19.6 78.7 -0.03 <br />GP-10RC 2/23/2012 11:40 0 1.9 17.8 80.3 -0.03 <br />GP-10S 1/4/2012 8:13 0 4 16.2 79.8 -0.02 <br />GP-10S 1/11/2012 9:17 0 3.9 16 80.1 -0.07 <br />GP-10S 1/18/2012 10:26 0 3.5 16.5 80 0 <br />GP-10S 1/24/2012 10:37 0 3.9 16.6 79.5 -0.03 <br />GP-10S 1/30/2012 8:31 0 3.7 16 80.3 -0.01 <br />GP-10S 2/8/2012 9:39 0 3.7 15.8 80.5 -0.01 <br />GP-10S 2/15/2012 9:30 0 3.9 15.7 80.4 -0.01 <br />GP-10S 2/23/2012 9:19 0 3.7 15.6 80.7 0.01 <br />GP-10S 3/28/2012 13:19 0 2.8 16.9 80.3 -0.03 <br />Initial monitoring