Laserfiche WebLink
First Quarter 2012 <br />Table 1. Subsurface Evaluation and LFG Monitoring Probe Testing Results <br />Forward Landfill, Manteca, California <br />Job No. 07207048.00 <br />Name Date Time <br />Methane <br />(% by vol) <br />Carbon <br />Dioxide <br />(% by vol) <br />O2 <br />(% by vol) <br />Balance <br />(% by vol) <br />Rel <br />Press <br />(H2O inch)Comments <br />GP-11D 1/4/2012 8:17 0 1 20.1 78.9 -0.07 <br />GP-11D 1/11/2012 9:20 0 1.6 20.6 77.8 -0.09 <br />GP-11D 1/18/2012 10:30 0 0.7 20 79.3 -0.07 <br />GP-11D 1/24/2012 10:42 0 1.2 19.6 79.2 -0.12 <br />GP-11D 1/30/2012 8:35 0 1.1 19.8 79.1 -0.03 <br />GP-11D 2/8/2012 9:43 0 1.3 19.6 79.1 -0.08 <br />GP-11D 2/15/2012 9:33 0 1.6 20.7 77.69 -0.16 <br />GP-11D 2/23/2012 9:30 0 0.9 20.2 78.89 -0.08 <br />GP-11D 3/28/2012 13:23 0 0.4 20.6 79 -0.07 <br />GP-11M 1/4/2012 8:18 0 0.8 19.8 79.39 -0.03 <br />GP-11M 1/11/2012 9:21 0 0.8 20.4 78.79 -0.03 <br />GP-11M 1/18/2012 10:31 0 0.6 19.9 79.5 -0.01 <br />GP-11M 1/24/2012 10:43 0 0.6 19.7 79.69 -0.05 <br />GP-11M 1/30/2012 8:36 0 0.6 19.4 80 -0.02 <br />GP-11M 2/8/2012 9:44 0 0.5 19.4 80.1 -0.05 <br />GP-11M 2/15/2012 9:34 0 0.8 20.5 78.69 -0.07 <br />GP-11M 2/23/2012 9:32 0 0.5 20 79.5 -0.03 <br />GP-11M 3/28/2012 13:25 0 0.4 20.1 79.5 -0.07 <br />GP-11RA 2/23/2012 11:49 0 0.9 20.5 78.6 -0.05 <br />GP-11RB 2/23/2012 11:50 0 1.5 19.6 78.9 0 <br />GP-11RC 2/23/2012 11:52 0 0.9 19.9 79.19 0.07 <br />GP-11S 1/4/2012 8:20 0 0.9 20 79.1 -0.07 <br />GP-11S 1/11/2012 9:23 0 0.6 20.7 78.69 -0.06 <br />GP-11S 1/18/2012 10:33 0 0.7 19.9 79.4 -0.05 <br />GP-11S 1/24/2012 10:45 0 0.6 19.8 79.6 -0.11 <br />GP-11S 1/30/2012 8:37 0 0.6 19.8 79.6 -0.05 <br />GP-11S 2/8/2012 9:45 0 0.6 19.8 79.6 -0.1 <br />GP-11S 2/15/2012 9:35 0 0.6 20.9 78.5 -0.15 <br />GP-11S 2/23/2012 9:33 0 0.5 20.3 79.19 -0.08 <br />Initial monitoring