Laserfiche WebLink
Sampling And Analytical"Protocol <br /> The following protocols have been developed to increase the accuracy and comParabilit <br /> groundwater monitoringdata The Y-of the <br /> Purposes of estabtis ° and following, field protocols <br /> •(1) to reduce sources of error that can be introduced during arc <br /> sampling and, t® +collect sum <br /> In a consistent manner so that data sets arc'comparable_ pies <br /> The,_ Protect goats for <br /> cnmparabitity .and accuracy include following the duces deurl°bea in this section to the <br /> Cxtent-Possible. When field conditions necessitate a change from,the <br /> established protocols, the <br /> neccssary changes will be implemented with maintenance of sampling:accuracy and data set <br /> ,Comparability as priorities. Airy modification to the standard Procedures delineated in this <br /> protocol necessitated by field conditions and the-reasons-will be noted on the Technicians Daily <br /> Report(See Section 2.7)_. <br /> Depth To Water Measurements <br /> Depth to water measurements will be made in all_the wells at the site prior to initiating purging <br /> andPzamling, including-wells that.are not to be sampled .The measurements Will be made fou, <br /> tunes a year prior to initiating each sampling round ?here are no piezometers at the site She <br /> depth to water measurements will be made consecutively,in-as.short a time as po=-bl,, io reduce.: � <br /> potential errors due to daily variations in the water table- <br /> Depth-to-water. (DTW} will be measured .in the well to within 11100 of a foot using a <br /> conducxivity-based water level indicator.- Measurements will be taken from the north or ruarked <br /> side of the top of casing of each well. These marks on the casings have been surveyed by a <br /> stu-vey relative to M=m sea level ). wells with dedicated Pun <br /> 4n,the water level <br /> Probe is inserted into the well through a special hole in the well cap. The conductivity probe and <br /> cable-Will be rinsed in deionized water before and af3ca-m the fim.well, and-after each <br /> subsequent well. The same water level indicator will be used in each well. Depth to water <br /> InemIrern,ant will be recorded on a field observation-sheaf.. <br /> Monitoring Well Purging prior To Sampling <br /> Groundwatcr•samplcs will be.collected from wdsting monitoring wells at Forward Landfill after <br /> Pig the wcr,stan&g in the well° This water will be purged using either dedicated Pumps <br /> or*aSP44W Purgepumpthat is daconbminated between each wilt. The following Proccdtn c will <br /> be used to purge the waW sWxbg in the welt prior to=mpling the wells: _ <br /> l <br /> 849-Fo 312310 A-6 My 14,2040 <br /> COO-A&200 Kk&tMda,Inc. <br />