Laserfiche WebLink
1. The pH, conductivity, and turbidity meters will be calibrated at a minimum at the <br /> beginning of each sampling day using commercially obtaibed.standards. Calibration will <br /> be checked two to three times during the day to evaluate the potential that the calibration <br /> is ddfdng throughout the day. If instnnnent drift is detected in the field, the <br /> mem=ments taken dming purging and sampling will be adjusted accoaiingly. Example <br /> calibration logs are included in.Appendi'x'C. During purging and sampling of the wells <br /> the instruments will be used in the same manner as dxring calibration. <br /> 2. Depth to water will be measured again, prior to sampling, in each well as described in <br /> Section 4.4.1 and recorded on the Purge Characterization aad Sample Log. The volume <br /> of groundwater in the well using will be calculated using the following equation(s): <br /> 4-inch well: (Thiel Well Depth from the mark on the well casing (ft) - DTW (ft)) x <br /> 0.653gal/fL <br /> .3.' Prior to purging, thc-water•will.be%exaunined••:by-using-a di sable bailer that is clear- <br /> -enough to see through. Pcafinrs such as immiscible lay= will be noted and m <br /> ;t„ ;Sra-ble layers-are observed the well will not be purged prior to sampling. <br /> 4__ The well will then be purged using the-purge pumps_:Due to thc-fact tba:t the pumps must <br /> Pe water from depths as great as 70 tci S0 fess below ground surface,Purge rates range <br /> from I/4 to 1 gallon per minute. Thi.s'purge rate does not appear to exceed the recharge <br /> rates. of the wells. Purge water will be ALwl argcd to-the ground (sec Section 4.4.6)- <br /> to water in cats will be taken periodically during purging. The purpose of <br /> these measurements is to monitor drawdown. If a decrease in groundwater elevation is <br /> .noted, the purge rate will be untoequilibrium(purge rate equals rehazge rate) <br /> is achieved. The fre�y of mc&sure:mcnt will be-once every five minutes initially <br /> decreasing to once every one-hatfhour once equt'h�has been reached. <br /> If equilibrium cannot be reached,it will be to purge the well to dryness. Purge. <br /> until less than 101% of the ori " volume of water repi2ins in the well, Hand bairmg <br /> y be acquired to meet this objective. Monitor the DTW every 15 minutes to evaluate <br /> rtcharge. Start sample collection when either two fat of water has filled the well or.1.75 <br /> hours has elapsed since the end of purging. Collect volatile organics no later than two <br /> hours after pmziq. Record all actions and measur=c= associated with purging a well <br /> dry on the Purge ° � tion and SamPle Log. <br /> 1144-Ry IIU3��1OR34225 A-7 July 14,200 <br /> /08cKiiG KR. <br />