Laserfiche WebLink
® Test Results. The QA/QC Consultant will examine all results from laboratory acceptance testing and <br />will report any nonconformance to the Construction Manager. <br />Acceptance Test Failure. If a Geocomposite acceptance sample does not comply with the minimum <br />requirements of the Specifications, the Geocomposite roll from which the sample was taken will be <br />failed by the QA/QC Consultant, and replaced by the Geocomposite Manufacturer at no additional <br />cost to the Owner. The Design Engineer shall be contacted to determine additional acceptance <br />testing requirements. <br />4.4.3 Geocomposite Drainage Net Installation <br />Surface Preparation. Before geocomposite installation, the QA/QC Inspector will: <br />• Verify that all lines and grades have been verified by the Earthwork Contractor. <br />• Verify that the underlying geomembrane has been prepared in accordance with the <br />specifications, and that all associated documentation has been completed. <br />• Verify that soil or geomembrane surfaces do not contain protrusions that could damage <br />the geocomposite. <br />• Verify that there are no excessively soft areas that could damage the geocomposite. <br />• All construction stakes have been removed. <br />• Verify that all aspects of surface preparation have been performed according to the <br />specifications. <br />Geocomposite Placement and Seaming. During geocomposite placement the QA/QC Inspector <br />will: <br />• Observe the geocomposite as it is deployed and record all defects and defect corrective <br />actions (panel rejected, patch installed, etc.). Verify that corrective actions are performed <br />in accordance with the specifications. <br />• Verify that equipment used does no damaged the geocomposite by handling, equipment <br />transit, leakage of hydrocarbons, or other means. <br />• Verify that crews working on the geocomposite do not smoke, wear shoes that could <br />damage the geocomposite, or engage in activities that could damage the geocomposite. <br />• Verify that the geonet side of the geocomposite is placed against the smooth side of the <br />0 Page 41 <br />