My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />• Tensile Strength at 5 percent strain per ASTM D6637, Method A <br />The QA/QC Consultant shall perform a tensile strength test. In addition to the ultimate tensile <br />strength and the tensile strength at 5 percent strain, the entire load -strain curve shall be reported. <br />Sampling Procedures. Samples will be taken across the entire width of the roll. Unless otherwise <br />specified, samples will be 3 ft (1 m) long by the roll width. The QA/QC Consultant will mark the <br />machine direction on the samples with an arrow. <br />Test Results. The QA/QC Consultant will examine all results from laboratory acceptance testing and <br />will report any nonconformance to the Construction Manager. <br />Acceptance Test Failure. If a geogrid acceptance sample does not comply with the minimum <br />requirements of the Specifications, the geogrid roll from which the sample was taken will be failed <br />by the QA/QC Consultant, and replaced by the geogrid Manufacturer at no additional cost to the <br />Owner. The Design Engineer shall be contacted to determine additional acceptance testing <br />requirements. <br />Adlk <br />4.6.3 Geogrid Installation <br />qW <br />Surface Preparation. Before geogrid installation, the QA/QC Inspector will: <br />• Verify that all lines and grades have been verified by the Earthwork Contractor. <br />• Verify that the underlying earthwork has been prepared in accordance with the <br />specifications, and that all associated documentation has been completed. <br />• Verify that soil surfaces do not contain protrusions that could damage the geogrid. <br />• All construction stakes have been removed. <br />• Verify that all aspects of surface preparation have been performed according to the <br />specifications. <br />Geogrid Placement and Seaming. During geocomposite placement the QA/QC Inspector will: <br />• Observe the geogrid as it is deployed and record all defects and defect corrective actions <br />(panel rejected, patch installed, etc.). Verify that corrective actions are performed in <br />accordance with the specifications. <br />0 Page 47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.