Laserfiche WebLink
• Verify that equipment used does not damage the geogrid by handling, equipment transit, <br />leakage of hydrocarbons, or other means. <br />• Verify that crews working on the geogrid do not smoke, wear shoes that could damage <br />the geogrid, or engage in activities that could damage the geogrid. <br />• Verify that the geogrid is securely anchored and alain flat, free of wrinkles. <br />• Verify that adjacent panels are overlapped and seamed in accordance with the <br />Specifications. <br />• Examine the geogrid after installation to ensure that no potentially harmful foreign <br />objects are present. <br />The QA/QC Inspector must inform both the QA/QC Manager and the Geosynthetics Contractor if <br />the above conditions are not met. <br />4.6.4 Repairs <br />Repair procedures include: <br />• Patching --used to repair large holes, tears, and small defective areas. <br />• Removal --used to replace large defective areas where the preceding method is not <br />appropriate. <br />Repair procedures shall be performed per specifications. <br />Page 48 0 <br />