Laserfiche WebLink
PART 3 <br />3.1 <br />WN <br />3.3 <br />peak leak signal plus noise signal to background noise ratio R=(S+N)BN <br />for each of the recorded data lines. The measured leak signals must have <br />characteristics of a leak. Wild data points that deviate from the theoretical <br />leak signals shall not be used to determine R. <br />5. The two farthest lateral lines of data with an R value greater than 3.0 shall <br />be noted. The average of the lateral distance from the leak for these two <br />lines is defined to be the leak detection distance for the artificial leak <br />6. If unfavorable site conditions prevent obtaining an R ratio of 3.0 from being <br />obtained, the leak location equipment shall be demonstrated to be able to <br />detect an artificial leak from a smaller distance no less than 1 foot to verify <br />that the leak location equipment is operational. <br />LEAK LOCATION SURVEY <br />PREPARATION <br />A. The EARTHWORK CONTRACTOR shall uniformly wet the bare geomembrane <br />with an equivalent of 0.2 -inches of water prior to the leak location survey <br />B. The EARTHWORK CONTRACTOR shall uniformly wet the granular drainage <br />material to field capacity. <br />C. The GEOSYNTHETICS CONTRACTOR shall terminate the edge of <br />geomembrane so that it is electrically isolated from earth ground. This requires <br />leaving the geomembrane bare around a narrow strip around the perimeter of the <br />geomembrane test area. is <br />D. The CONTRACTOR'S shall assist the Leak Location Contractor with other <br />preparations that may be necessary to meet the performance requirements of the <br />leak location survey. <br />LEAK SURVEY <br />A. The leak location data shall be taken: <br />1. With a uniform measurement density of greater than one measurement every <br />10 square feet, or <br />2. On survey lines spaced no further apart than twice the leak detection distance <br />determined for the artificial leak as discussed in Part 2. The measurement <br />electrode spacing shall be no less than that used for the performance <br />demonstration. The spacing between measurements shall be no more than that <br />used for the performance demonstration. <br />B. The data shall be recorded, plotted, and analyzed for leak signals. The positions <br />of these leak signals shall be located and the leaks excavated. The leaks shall be <br />repaired in accordance with the specified requirements for HDPE geomembrane. <br />C. Following the repair, the leak location survey shall be repeated on the two closest <br />survey lines for a distance extending 20 feet before and beyond the leak. If <br />another leak signal is detected, the entire repair and resurvey process shall be <br />repeated until no additional leaks are detected. <br />REPORTING <br />Forward Landfill WMU FU -13 ATTACHMENT A <br />2 LEAK LOCATION TESTING <br />