Laserfiche WebLink
A. The daily results of the leak location survey shall be reported to the QA/QC <br />® CONSULTANT. <br />B. A report documenting the electrical leak location survey shall be submitted within <br />7 days of the completion of each leak survey. The report shall document the <br />methodology used, the locations and descriptions of the leaks, and a figure of the <br />WMU showing the approximate leak locations. <br />END OF ATTACHMENT A <br />Forward Landfill WMU FU -13 ATTACHMENT A <br />3 LEAK LOCATION TESTING <br />