My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Geo-Losis <br />ASSOCIATE <br />CQA DAILY SUMMARY REPORT #001 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geologic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 001 Report Date: Thursday May 16, 2013 Onsite: 07:00 - 17:30 Hrs <br />Weather: AM: 64°F P. Cloudy -Rain PM: 76°F P. Cloudy <br />Guinn Construction Activities: <br />• Guinn construction continued clearing the existing north and west slope areas in preparation for buttress fill <br />placement. <br />• The Contractor started subgrade preparation along the toe of the west and north slopes; performed moisture <br />conditioning and compaction work. <br />• <br />Personnel: (1) Superintendent, (1) Grade Checker, (4) Operators, (2) Laborers. <br />Equipment: (1) 825 Cat Sheepsfoot compactor, (1) 140H Cat Motor -Grader, (2) Water trucks, (1) Cat Excavator, <br />(3) D6 Cat Dozers, (2) 637 Cat Scrapers, (1) Cat Fork-lift. <br />CQA (GLA) Activities: Field Personnel (1) <br />• CQA personnel met with Ruben (Site Manager) and Kevin (Guinn construction superintendent) upon arrival <br />to the construction site. <br />• CQA personnel performed construction site walk with Kevin (Guinn Superintendent); discussed projected <br />activity and work schedule. <br />• CQA personnel monitored top soil removal from fill areas. The unsuitable soil was transferred to a designated <br />area for site operations use as daily refuse cover. <br />• CQA personnel monitored subgrade preparation and excavation work along the Cell floor. <br />• CQA personnel monitored the clearing work being performed along the west and north slopes tie-in line <br />exposing the existing synthetic liner. <br />• Meetings and Site Discussions: <br />PAGE 1 OF 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.