Laserfiche WebLink
Geo -Lo <br />iC <br />ASSOCIATESS <br />CQA DAILY SUMMARY REPORT <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />• Met with Kevin (Guinn Superintendent) in the morning to discussed planned work shift activity. The <br />Contractor would start preparing subgrade along the toe of the existing slope adjacent to WMU-10 and <br />WMU-8 and start buttress fill placement. CQA advised contractor to moisture condition and compact <br />subgrade. CQA personnel would be performing subgrade moisture -density testing prior to the fill placement. <br />Site Visitors: <br />• None. <br />Photos: <br />Fig.1 Looking North on WMU-FU13. <br />PACE 2 OF 3 <br />• <br />