• <br />Geo-LoqkASS0CIATES <br />CQA DAILY SUMMARY REPORT #009 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: <br />Manteca, CA Owner: <br />Republic Services <br />CQA Consultant: <br />Geologic Associates Contractors: <br />Guinn Construction <br />Prepared by: <br />Jose Armenta (GLA) <br />Comanco Environmental Corp. <br />Submitted to: <br />Scott Purdy (GLA) <br />Project #: <br />2013-AO55 <br />Report No.: 009 <br />Report Date: Wednesday May 29, 2013 <br />Onsite: 06:00 - 16:30 Hrs <br />Weather: AM: 57 <br />OF Clear <br />PM: 82°F Clear <br />Guinn Construction Activities: <br />• Guinn construction continued clearing work on proposed clay borrow area located approximately 400 ft east <br />of WMU FU13. The unsuitable soil material was transferred and stockpiled along the south side of the <br />proposed clay borrow. <br />• The Contractor continued buttress fill placement using material from cut floor area. The Contractor <br />performed continuous moisture conditioning and sheepsfoot compaction work. <br />0 <br />• The Contractor started rough grading of 2:1 slope area with D6 Cat dozer. <br />• The Contractor performed continuous moisture conditioning of haul roads and adjacent areas for dust <br />control. <br />Personnel: (1) Superintendent, (1) Grade Checker, (7) Operators, (2) Laborers. <br />Equipment: (1) 825 Cat Sheepsfoot compactor, (1) 140H Cat Motor -Grader, (2) Water trucks, (1) Cat Excavator, <br />(3) D6 Cat Dozers, (5) 637 Cat Scrapers, (1) Cat Fork-lift. <br />CQA (GLA) Activities: Field Personnel (1) <br />CQA personnel performed continuous monitoring and lab and field moisture -density testing of the buttress fill <br />placement. <br />• CQA personnel continued monitoring excavation work in the Cell floor. <br />• CQA personnel continued monitoring the clearing work being performed on proposed clay borrow. <br />•Meetings and Site Discussions: <br />• Met with Kevin Turner (Guinn Superintendent) in the morning to discuss planned activity for the work shift. <br />The Contractor would continue buttress fill along the WMU-8 existing slope and the WMU FU13 floor <br />