Laserfiche WebLink
Geo-LoqkA S S O C I AT E S <br />CQA DAILY SUMMARY REPORT #009 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />excavation. The Contractor would continue clearing and grubbing on proposed clay borrow located <br />approximately 400 ft east of the Unit. The Contractor would perform grading work with D6 Dozer and Motor <br />grader. <br />Site Visitors: <br />• None <br />Photos: <br />Fig.1 Looking west on east side of proposed clay borrow. <br />• <br />